Báo Bình Dương điện tử - www.baobinhduong.vn
Tổng Biên tập: LÊ MINH TÙNG
Phó Tổng Biên tập: HUỲNH MINH DÂN - NGUYỄN QUỐC LIÊM
The North-South corridor expressway, running from Huu Nghi border gate to Ca Mau, is 2,063 km long as designed. As of May 2024, a total of 1,187 km have been put into operation, 861 km are under construction, and the remaining 15 km are under preparation for investment.
VNA